Smart Junction Boxes
Reduce Costs Related to Field Wiring and Cabinets

Emerson’s Smart Junction Boxes provide an off-the-shelf solution for faster project execution and reduced installation costs. Bring a positive step change to your field enclosures by reducing system footprint, eliminating I/O home run cables, and significantly reducing cabinet design engineering.

A single cabinet or enclosure design can serve a wide variety of I/O signals. Field wiring is complete at the terminal block; no custom design of marshalling wiring is needed. Internal cross wiring and I/O rationalization are eliminated.

Add Flexibility to the Schedule
Pre-engineered field enclosures allow you to delay your design freeze and accommodate late I/O changes without re-engineering and re-wiring. In fact, you can create up to 15 weeks of slack time in your project schedule to accommodate late design changes or start up earlier.

Achieve Good Design While Reducing Costs
To provide more predictable costs, Smart Junction Boxes and cabinets offer proven designs that improve quality and consistency while reducing unexpected rework. Standardization also reduces maintenance and support costs. The pre-engineered, documented, configurable solutions reduce the scope of Factory Acceptance Test (FAT), and hardware testing can be delayed until site acceptance.

Connect in the Field and Eliminate Expenses
Eliminate long, expensive multi-core cable runs from field devices to the DeltaV distributed control system (DCS) cabinet in the control room. Instead, use short runs of multi-core cables to connect devices directly to a local Smart Junction Box in the field, then connect a less-expensive single fiber or Ethernet cable from the box to the control room. The technology saves money in home-run multi-core cables but savings in wiring costs extend beyond the wires themselves to include engineering time, cable trays, conduits, and the labor required to lay the wire and connect each device.


Featured Resources

Project Certainty

A transformational approach to achieve top quartile performance in capital projects.

Avoid Costly Change Orders

Engineering time and materials costs fall by accommodating I/O design changes.

Look at Projects Differently

Simplify project execution, increase project schedule flexibility, and streamline project resources.